From telling a factory from a trading company to how many metres fit a 40HQ — forty questions buyers ask before the first order, each answered with usable numbers.
After more than a decade of exporting roller blind fabric, the questions overseas buyers ask have become remarkably predictable. What actually stops a first order is never “who is cheapest”. It is forty small questions specific enough to be answered in an email: does this price include the coating, can you run 300 metres, why does the bulk not match the sample, how many metres really fit in a 40HQ, and will customs classify this under 6303 or 6304. We compiled this from the enquiries, factory-audit questionnaires and claim files we handled in 2026, arranged in eight stages, with numbers you can take straight into a price comparison.
1. Suppliers and factories (Q1–Q5)
Q1: How do I tell a factory from a trading company quickly? Ignore the business licence. Ask for three things: the discharge permit showing dyeing or coating as a licensed process, the equipment list for stenter frames and coating lines including working width and line speed, and the electricity consumption curve for the last three months. A trader can build a beautiful showroom but cannot explain the relationship between coating line speed and oven length. Keqiao’s advantage is not the scale of any single mill; it is that weaving, dyeing, coating, testing and rolling sit within thirty kilometres of each other, which is why a 280 gsm blackout can reach first dye lot in seven days here.
Q2: How do I verify capacity instead of accepting “a million metres a month”? Break it down by process: looms × speed × effective hours gives greige output; number of stenter lines × daily throughput; coating line speed in metres per minute × width × shifts. The shortest link is the real capacity. Many mills buy greige outside and run a single coating line, which means your order queues behind someone else’s in peak season.
Q3: Should I visit the factory or check samples first? Samples first, but with conditions: ask for the dye lot number, production date, greige batch and a retained sample from the same lot in the same email. Suppliers who provide all four will usually also welcome a visit. Suppliers who send only glossy photographs and refuse lot numbers are the ones you will argue with about shade later.
Q4: Which corners of a factory actually matter during an audit? Four: the greige warehouse (zoning, nothing on the floor), the colour kitchen (spectrophotometer and standard light booth), the inspection table (fabric inspection machine and a light canopy of at least 750 lux), and the retained-sample room (same-lot samples filed by date). These four corners tell you more about whether a quality system is running than any certificate on the wall.
Q5: How do I avoid “the sample is art, the bulk is something else”? Make the sealed sample a three-party item: one retained by the mill, one by you, one by a third-party lab, all from the same dye lot and date, signed by both sides. When the container arrives you compare against the sealed sample, not against photographs. This costs one paragraph in a contract and removes most of the argument later.
2. Product and specification (Q6–Q10)
Q6: How should “blackout” actually be defined? Three different claims get mixed together: dimout (typically 95–99% light blocking), blackout (99.9% and above, normally three coating passes or a blackout laminate), and “visually opaque” (no light spot visible when the fabric is pressed against a window). Before ordering, agree the test method: spectrophotometer transmission across 380–780 nm, or a torch pressed against the fabric in a dark room. The two methods can differ by a full grade.
Q7: Does higher gsm mean better blackout? No. Blackout comes from the opacity pigments in the coating — titanium dioxide, carbon black — and from the number of passes, not from yarn weight alone. A 280 gsm three-pass white coating can reach 99.9%, while a 420 gsm single-pass heavy jacquard may sit at 95%. Always specify weight, coating structure and blackout grade together.
Q8: Should I choose 2.0 m, 2.8 m or 3.0 m width? It depends on your window geometry and cutting waste. European residential windows are typically 1.4–1.6 m high, so 2.0 m rolls cut vertically with minimal waste. Gulf and contract projects run 2.8–3.2 m floor-to-ceiling, where 2.8 m or 3.0 m widths avoid horizontal joins. Choosing the wrong width can push waste from 8% to 25%, which matters far more than five cents a metre.
Q9: Which coating for which application? Acrylic foam coating is soft and mid-to-high in opacity, good for residential. Polyurethane is flex-crack resistant and performs at low temperature, suited to cold climates and motorised blinds that roll frequently. PVC is weather resistant and weldable, right for outdoor and humid environments, but watch plasticiser migration and REACH restrictions. You are choosing an environment, not a price.
Q10: How do I write openness factor into a contract? State the openness factor (3%, 5%, 10%) together with warp and weft density and yarn diameter, and attach a 20× magnification photo. A bare “5% openness” invites disagreement, because different weave constructions at the same nominal openness look very different in daylight.
3. MOQ, sampling and the first order (Q11–Q15)
Q11: Why is the minimum always 300–500 m per colour for dyed fabric? Because dyeing machines have a minimum liquor capacity. A 500 kg vessel running 280 gsm at 2.8 m width has an economic batch of roughly 400–600 m. Below that, temperature control, liquor ratio and rope speed become unstable and shade variation rises sharply. The MOQ is physics, not arrogance.
Q12: Can I trial 100–200 m? Three routes. First, buy a stock shade: most mills hold 8–15 base colours from 100 m. Second, combine colours in one dye batch — three shades in a single vessel can bring each down to 150–200 m, at the cost of letting the mill sequence the lots. Third, buy greige and finish locally, if you have coating capacity nearby.
Q13: Is the sampling fee refundable? Usually creditable against the first order, but write the conditions: credited once the first order reaches an agreed volume (typically 1,000–2,000 m), and only once. Sampling fees generally run USD 80–200 per colour including one courier shipment. Do not skip sampling to save it; one wrong shade costs roughly twenty times the fee to rework.
Q14: How large should a first order be? Work backwards from three months of sales plus one safety stock, which usually lands at 1,500–3,000 m across two to four colours. Below 1,000 m, freight and documentation per metre eat the margin. Above 5,000 m, a wrong colour call ties up cash in inventory.
Q15: What lead time is realistic, and how do I stop it slipping? The normal statement is 25–35 days after shade approval. Break it into greige availability 5–7 days, dyeing 7–10, coating 3–5, inspection and rolling 2–3, loading 2. Add 3–5 days to each block in peak season (March–May, September–November). Writing the blocks into the PO is more useful than one total number.
4. Price and payment (Q16–Q20)
Q16: What really differs between FOB, CIF and DDP? Under FOB, risk passes when the cargo crosses the ship’s rail and you pay freight and insurance. Under CIF, the seller pays freight and insurance to the destination port, but risk still passes at the port of shipment. Under DDP, the seller carries everything to your door — destination THC, clearance, duty, last-mile delivery. DDP looks convenient, so always demand the destination cost breakdown; hidden charges of USD 300–600 per container hide easily inside an all-in rate.
Q17: What should a quotation contain? At least nine items: product name and construction, weight and width, coating type and number of passes, blackout grade and test method, shade reference and acceptable lot tolerance, unit price and price basis (FOB Shanghai or Ningbo), MOQ and quantity breaks, lead time, and validity. Any missing item becomes a reason for a surcharge later.
Q18: What payment terms are safe? For a first order, 30% deposit with 70% against a copy of the bill of lading. Established customers can move to 20/80 or 30-day terms. Above USD 50,000, or with a new buyer in a new market, a sight letter of credit is safer, but budget for discrepancy fees of USD 75–250 each and five banking days for examination. Chinese export credit insurance can cover part of the buyer risk and is worth asking about.
Q19: Is a price increase justified when raw materials rise? In 2026 the move was real: disperse dyes rose from CNY 23 to 30 per kg and reactive dyes from CNY 29 to 45, pushing dyeing chemicals from roughly 25% to over 40% of dyeing cost. A fair mechanism is an index-linked clause: reviewed quarterly, adjusted only when the index moves more than 5%, with the movement shared equally.
Q20: How should currency risk be handled? Two instruments: shorten quotation validity to 15 days with an explicit exchange rate baseline in the contract, and use forward settlement for orders beyond six months. Do not accept vague “subject to market” wording, which only ever becomes a price increase notice when the currency moves.
5. Quality and claims (Q21–Q25)
Q21: What AQL makes sense? ANSI/ASQ Z1.4 general inspection level II is common: critical 0, major 2.5, minor 4.0. Remember that AQL qualifies the batch, not the worst roll in it. For contract work, add a roll-by-roll acceptance clause so each roll is judged individually.
Q22: What are the four most common defects? Shade variation (lot-to-lot, side-to-centre, head-to-tail); bowing and skewing above 2%, which shows as a diagonal wave on a roller blind; coating defects such as skips, bubbles and scratches; and short length, where a nominal 50 m roll measures 47–48 m. The first two are controlled by sealed samples and inspection machines, the last two by inline detection and roll metering.
Q23: What shade tolerance is acceptable? Within one order, aim for ΔE of 1.0 or less (CIE Lab, D65/10°); between lots, 1.5 or less. Deep shades — navy, forest green, charcoal — are hardest, and 2.0 may be realistic, but then each roll must be marked by lot so you can install window by window.
Q24: How do I prevent short rolls? Specify full measure in the contract, require the rolling machine’s metering log to travel with the goods, and re-measure 10% of rolls on arrival. For any shortfall above 1%, claim double the missing metres. Mills that know this clause is in place typically run short-roll rates below 0.5%.
Q25: What evidence does a claim need? Four items: photographs of the sealed sample with lot number and date, a continuous uncut unboxing video, a defect map stating roll number and metre position, and a third-party test report. Missing any one of them turns the conversation from “how much” into “whether it is even our problem”.
6. Shipping and documents (Q26–Q30)
Q26: How many metres fit in a 40HQ? Estimate from roll diameter. Internal dimensions are about 12.03 × 2.35 × 2.39 m. Rolls lie horizontally with their axis along the container length. At 280 gsm, 2.8 m width, 50 m per roll and roughly 0.35 m diameter, you can place about 4 × 6 × 6 = 144 rolls, close to 7,200 m. A 420 gsm blackout at 0.42 m diameter gives about 100 rolls, some 5,000 m. A 120 gsm sheer at 100 m per roll and 0.30 m diameter can reach about 190 rolls, nearly 19,000 m. All three are volume-limited, not weight-limited, and the loading plan governs.
Q27: Where are freight rates now? As of 19 November 2026 the Drewry World Container Index stood at USD 4,176 per 40ft, down 3% week on week, with Shanghai–Los Angeles at USD 7,026 and Shanghai–New York at USD 8,194. Spread across 7,200 m, that is roughly USD 0.58 per metre — minor for a blackout selling above USD 2 per metre, decisive for a sheer selling near USD 1.
Q28: Do war risk and surcharges need separate budgeting? Yes. With more capacity returning to Suez, the Asia–Europe rate base has softened, but the Strait of Hormuz is a different story: by 19 November the crisis had run 266 days at the highest risk level, with more than a dozen vessel incidents during the month. War risk premiums and rerouting costs go straight into the quote. For Gulf-bound cargo, insist that your forwarder lists the war risk surcharge and its validity separately.
Q29: Which documents are required? Commercial invoice, packing list, bill of lading, certificate of origin (general CO or a preferential form such as FORM E or FORM A), plus destination-specific certificates: SABER PC and SC for Saudi Arabia, SONCAP for Nigeria, PVoC for Kenya. EU buyers also need textile labelling and a REACH conformity statement.
Q30: Why do destination charges always overrun? Because an FOB quote never mentions THC, documentation fees, seal fees, detention and terminal handling. At major Gulf ports, destination charges for a 40HQ commonly land between USD 350 and 700, and detention escalates daily from around day eight. Before signing CIF or DDP, ask for a destination cost sheet; it saves more than arguing over three cents a metre.
7. Compliance and duty (Q31–Q35)
Q31: Which HS code applies to roller blind fabric? The main candidates are 6303 (curtains, drapes, interior blinds, valances) and 6304 (other furnishing articles). Made-up goods with a tube or bottom rail tend towards 6303; roll goods that are coated but not sewn are often classified under 5903 (coated fabrics) or 6304. A wrong classification can trigger penalties of 0.5–4 times the value, so have the supplier state composition, weight, weave and whether the goods are made up on the invoice.
Q32: What is the duty burden into the United States? Base rates under 6303 run roughly 7–11.3%, and Section 301 additional duties lift the effective burden considerably. Note that the US suspension of Section 301 measures covering China’s maritime, logistics and shipbuilding sectors now runs to 9 January 2027. These windows change landed cost models directly, so have your broker confirm the live rate before you commit.
Q33: Where are the EU compliance thresholds? Three areas: REACH restrictions on flame retardants and plasticisers, the EU textile labelling regulation covering composition, country of origin and care, and the shipping surcharges that follow from full maritime inclusion in the EU ETS from 2026. If you claim flame retardancy, you must be able to produce EN 13773 or BS 5867 test reports.
Q34: What does Saudi Arabia and the Gulf require? A product certificate (PC) and shipment certificate (SC) through SABER, Arabic labelling, and conformity with the relevant SASO standards. Without the SC the cargo sits at the port and storage charges accrue daily. Contract work also needs attention to SBC fire requirements for window coverings.
Q35: What is unusual about India? BIS quality control orders apply to certain textiles, and imports face HSN classification and basic customs duty. India also maintains anti-dumping measures on specific products: woven linen fabrics under HS 5309 originating in China, for example, have had duties extended for a further five years. Checking whether your product sits on a measures list before shipment is far cheaper than appealing afterwards.
8. Market and after-sales (Q36–Q40)
Q36: Which markets look most certain for 2027? Three lines are reasonably clear: Gulf hospitality and residential handovers, with Saudi project volumes still releasing; European shading refurbishment and energy upgrades, largely replacement of existing windows; and baseline demand from housing completions in North America and India. Africa is the growth market, but more price-sensitive and more dependent on clearance capability.
Q37: Which product directions are worth backing in 2027? Four: matt-surface three-pass blackout replacing traditional glossy finishes; textured jacquard and crinkle surfaces that answer the “tactile performance” trend; high-shrink yarn constructions that create three-dimensional surfaces; and mono-material PET-based coated fabric for recyclability. The first two carry volume, the last two carry project work and premium.
Q38: What warranty is normal? Three to five years for residential fabric, five to ten for contract work, five for motorised systems with motor and battery counted separately. State the exclusions plainly: improper cleaning, coating chalking under prolonged direct sun, and use beyond rated load. A short, precise clause is worth more than a long vague one.
Q39: What gets overlooked most in after-sales? Spare parts. A tube, end cap, beaded chain, clutch or bottom rail plug costs under two dollars, yet missing one stops an entire blind. Order 1–2% spares with the first shipment; it is cheap and cuts the repair cycle from 45 days to about a week.
Q40: Where do I start with a private label? Build the minimum recognisable set first: a 30–50 SKU shade card, consistent roll labels and hang tags, and an electronic catalogue with technical data. Private label comes in three layers: relabelling (lightest), new packaging and shade cards (medium), and exclusive patterns and colourways (heaviest). Most distributors start at the second layer, where investment is controllable and identity is still visible.
What Wanbo does
We weave, dye, coat and export roller blind, curtain and solar shading fabric in Keqiao, Shaoxing, holding more than sixty base colours in stock, supporting combined-colour trials from 150–200 m, and providing three-party sealed samples, roll-by-roll inspection and matched spare-part kits. Any of the forty questions above can be sent to us with its number, and we will answer in the same terms — including the parts we cannot do.
Prices, freight rates and port conditions change daily. The figures here are for understanding structure and magnitude; they do not replace a quotation or sailing schedule issued today.
